
Rail corridor work rarely stays on the rails. Vegetation, drainage and embankment repairs sit on cuttings and slopes that a conventional road-rail machine can only reach from the track, and possession windows leave no time to bring in a second machine. The plant for this work is road-rail (RRV) walking excavators that can rail and de-rail and then climb off the track, rail-gauge mulchers, shears and grapple saws for vegetation, and rail trailers and dumpers for moving material along the line.
Exc@v8 supplies Menzi Muck’s road-rail range (the M545X RRV and M585 RRV excavators and the 65RD RRV rail dumper) alongside Seve’s tooling for rail vegetation control, and builds its own custom rail conversions in-house.

Rail Conversions by Exc@v8
Exc@v8 converts Menzi Muck walking spider excavators for the rail corridor — on/off-track running for vegetation clearance, embankment work and infrastructure access where road-rail plant is required.
More Info about Rail Conversions by Exc@v8
65RD RRV
The 65RD RRV is the road-rail version of the 65RD, Menzi Muck's 65RD RR: an 8,100 kg dumper carrying 4,200–6,300 kg, with hydraulic drive on the rail and the same hydraulically rotatable cab as the 65RD.
More Info about 65RD RRV
Menzi Muck M545X RRV
The M545X RRV is a road-rail excavator that switches from rail to walking excavator in minutes and tows up to 90 tonnes on rail.
More Info about Menzi Muck M545X RRV
Menzi Muck M585 RRV
The M585 RRV is a road-rail excavator with all-wheel steering, road speeds up to 25 km/h and a 115 kW Deutz engine.
More Info about Menzi Muck M585 RRV
Seve RAF32 Rail Trailer
The Seve RAF32 is a self-propelled rail trailer with a 6,016 mm by 2,500 mm load platform, a 32 tonne maximum load and a rail speed of up to 23 km/h, used with a Menzi Muck M585.
More Info about Seve RAF32 Rail Trailer
Seve Rail Axles
Seve's rail axles are hydrostatically driven axles made for the Menzi Muck M585, with 630 mm rail wheels, two travel speeds and a static capacity of 24 tonnes per axle.
More Info about Seve Rail Axles